Search result related to
How many seconds are there in 3 days

Notes

Y2K38

Greed according to hindu mythology

3i Infotech Placement Papers

Aptitude :: Time and Work -2

Aptitude :: Time and Work -1

CE 2357 SURVEY CAMP

THE KAMA SUTRA OF VATSYAYANA Part-22

UPSC CSE 2018

Immunology

Aptitude Test :: Problems on Trains -1

Questions


M can do a certain job in 14 days. N is 40% more efficient than M. The number of days, it takes N to do the same piece of work, is: (NIFT)
1 Answer

A ball weighing 25 grams is thrown vertically into the air. It takes 15 seconds to reach its highest point. How much time would it take to reach the ground from its highest point?
1 Answer

Peeyush has done 1/3rd of a job in 30 days, Sanjiv completes the rest of the job in 60 days. In how many days can they together do the job?
1 Answer

‘A’ can do a piece of work in 45 days, while ‘B’ alone can do it in 30 days. In how many days can ‘A’ and ‘B’ working together do it? (NIFT)
1 Answer

A alone can complete a work in 16 days and B alone in 12 days. Starting with A, they work on alternate days. The total work will be completed in
1 Answer

what is the period within which an employee should submit his explanation as specified in the charge sheet form
0 Answer

Replace the bold portion by choosing the phrase from the given alternatives that best keeps the meaning of the original sentence.
2 Answer

Consider the signal f(t) = 1 + 2 cos(πt) + 3 sin ( (2π/ 3) t) + 4 cos ( (π/ 2)t + π/ 4 ), where t is in seconds. Its fundamental time period, in seconds, is ______________.
0 Answer

A field can be reaped by 12 men or 18 women in 14 days. In how many days can 8 men and 16 women reap it? A. 26 days B. 24 days C. 9 days D. 8 days
1 Answer

Three men P, Q and R can do a piece of work in 14 days,16 days and 28 days respectively. They started working together and P and R left the work two days before the completion of work, find the total time taken by them to finish the work.
1 Answer

A traffic signal cycles from GREEN to YELLOW, YELLOW to RED and RED to GREEN. In each cycle, GREEN is turned on for 70 seconds, YELLOW is turned on for 5 seconds and the RED is turned on for 75 seconds. This traffic light has to be implemented using a finite state machine (FSM). The only input to this FSM is a clock of 5 second period. The minimum number of flip-flops required to implement this FSM is _______.
0 Answer

A takes 6 days less than B to do a work. If both A and B working together can do it in 4 days, how many days will B take to finish it? Mathematics CBSE class 10 2017
1 Answer

6 examiners working 5 hours a day can check 750 answer books in 8 days. At the same rate of checking, in what period of time can 4 examiners examine 800 answer books, working 8 hours a day? (NIFT UG)
1 Answer

6 examiners working 5 hours a day can check 750 answer books in 8 days. At the same rate of checking, in what period of time can 4 examiners examine 800 answer books, working 8 hours a day?
1 Answer

Five Men can paint a building in 20 days, 8 Women can paint the same building in 25 days and 10 Boys can paint it in 30 days. If a team has 2 Men, 6 Women and 5 Boys, how long will it take to paint the building ?
0 Answer

A alone can complete a work in 16 days and B alone in 12 days. Starting with A, they work on alternate days. The total work will be completed in
1 Answer

A small production unit now works 6 days per week with 7/2 hours of first shift every one of the 6 days and 3 hours of second shift for each of the first 5 days. Wage negotiations led to an agreement to work on 5 days a week with both shifts together clocking 15/2 hours per day with an 8% increase in weekly wages. How much change in the hourly production would mean parity in the agreement for both management and employees?
0 Answer

A can do a piece of work in 10 days, while B alone can do it in 15 days. They work together for 5 days and the rest of the work is done by C in 2 days. If they get Rs.450 for the whole work, how should they divide the money?
0 Answer

What is the time taken for a 300 metre long train speeding at 60 kmph to cross a pole ?
1 Answer

Forty five men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work? (NIFT PG 2016)
1 Answer
Speaks

You can do any of the following

Ask a question about this
Write a not about this