Eduladder - Pass any exams easily GATE,CBSE,Engineering
Search
Home
Notes
Ask?
Videos
Tour
Login
You want to learn we want to help you!
Open learning system V: 3.0
The Eduladder is a community of students, teachers, and programmers just interested to make you pass any exams. So we solve previous year question papers for you.
See
Our team
Wondering
how we keep quality?
Got unsolved questions??
Ask Questions
Previous Page
|
Next Page
Question
Likes!
Dislikes!
Answers!
New questions!.
What is the overoll vision of eduladder?
0
0
1
How to post an answer on eduladder
0
0
1
What and all i can share in eduladder videos
0
0
1
Why is it necessary to define a Test Strategy?
0
0
0
A test engineer is testing a Video Player (VCR), and logs the following report:
0
0
0
Maintenance testing is:
0
0
0
Why is incremental integration pref erred over “big bang” integration?
0
0
0
. V-Model is:
0
0
0
Which of the following items need not to be given in an incident report?
0
0
0
What is the purpose of test exit criteria in the test plan?
0
0
0
This part of a program is given:-
0
0
0
If a program is tested and 100% branch coverage is achieved, which of the following coverage criteria is then guaranteed to be achieved?
0
0
0
Which of the following project inputs influence testing?
0
0
0
Which of the following is most often considered as components interface bug?
0
0
0
Which of the following can be root cause of a bug in a software product?
0
0
0
Why is successful test execution automation difficult?
0
0
0
What test items should be put under configuration management?
0
0
0
Why can be tester dependent on configuration management?
0
0
0
This part of a program is given:-
0
0
0
If a program is tested and 100% condition coverage is achieved, which of the following coverage criteria is then guaranteed to be achieved?
0
0
0
A defect management system shall keep track of the status of every defect registered and enforce the rules about changing these states. If your task is to test the status tracking, which method would be best?
0
0
0
Which of the following techniques are black box techniques?
0
0
0
Which of the following is a valid collection of equivalence classes for the following problem: Paying with credit cards shall be possible with Visa, Master and Amex cards only.
0
0
0
Which of the following is a valid collection of equivalence classes for the following problem: An integer field shall contain values from and including 1 to and including 15
0
0
0
What makes an inspection different from other review types?
0
0
0
Which of the following statements is correct?
0
0
0
Which set of metrics can be used for monitoring of the test execution?
0
0
0
The following list contains risks that have been identified for a software product to be developed. Which of these risks is an example of a product risk?
0
0
0
Which of the following list contains only non-functional tests?
0
0
0
Why does the boundary value analysis provide good test cases?
0
0
0
Which of the following activities differentiate a walkthrough from a formal review?
0
0
0
In system testing...
0
0
0
Which of the following statements contains a valid goal for a functional test set?
0
0
0
In foundation level syllabus you will find the main basic principles of testing. Which of the following sentences describes one of these basic principles?
0
0
0
Acme Inc. decides to use functional test execution automation tool for testing GUI of their product. The GUI is expected to change frequently. Acme Inc. has put some of the manual testers through a 3 day training program on how to use the tool. Which of the following is likely to be true?
0
0
0
Which of the following is correct about static analysis tools
0
0
0
For the code fragment given below, which answer correctly represents minimum tests required for statement and branch coverage respectively?
0
0
0
In a flight reservation system, the number of available seats in each plane model is an input. A plane may have any positive number of available seats, up to the given capacity of the plane. Using Boundary Value analysis, a list of available – seat values were generated. Which of the following lists is correct?
0
0
0
Which of the following is correct about static analysis tools?
0
0
0
A number of critical bugs are fixed in software. All the bugs are in one module, related to reports. The test manager decides to do regression testing only on the reports module.
0
0
0
Integration testing has following characteristics
0
0
0
Why is testing necessary?
0
0
0
Which of the following is true
0
0
0
The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. When the temperature is more than 21. Identify the Equivalance values which belong to the same class.
0
0
0
Handover of Testware is a part of which Phase
0
0
0
Which of the following items would not come under Configuration Management?
0
0
0
Reporting Discrepancies as incidents is a part of which phase :-
0
0
0
Reviewing the test Basis is a part of which phase
0
0
0
One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class
0
0
0
Static analysis is best described as:
0
0
0
Previous Page
|
Next Page
Want to exlplore yourself?