Logo

The Eduladder is a community of students, teachers, and programmers just interested to make you pass any exams.
Here we host videos for you.

Building command line applications


Video description

explains how to create command line applications

Date of upload

DateMay 19, 2019 12:00:00 AM

Total views

Visits351

Uploaded By

nadeembabu100

Related questions

Which of the following parameters is essential to estimate the Envelope Performance Factor (EPF) of a building as per the Energy Conservation Building Code (ECBC), 2011?

Two men on either side of a 75 m high building and in line with base of building observe the angles of elevation of the top of the building as 30° and 60°. Find the distance between the two men. CBSE Mathematics

Ms. X came out of a building through its front door to find her shadow due to the morning sun falling to her right side with the building to her back. From this, it can be inferred that building is facing _________

You are inside a cinema hall 100 feet high. Adjacent to the cinema hall is an office building of the same height. The office building is divided into floors of equal height. Each floor of the office building has a window on the outside. How many windows would the building have when viewed from outside?

A public utility building of 5000 m2 was constructed 5 years before, on a site of 1 hectare. The present value of open land in that location is Rs. 100/m2 and present construction cost of such building is Rs. 2500/m2 . If the value of the building is assumed to be depreciating at a constant rate of 6 percent per annum, then the present value of the property using ‘Valuation by Cost Method’ is ________ (in Rs. lakhs) (rounded off to one decimal place).

The angles of depression of the top and bottom of a 50 m high building from the top of a tower are 45° and 60° respectively. Find the height of the tower and the horizontal distance between the tower and the building. CBSE Mathematics

The angles of depression of the top and the bottom of a building 50 metres high as observed from the top of a tower are 30 0 and 60 0 respectively. Find the height of the tower and also the horizontal distance between the building and the tower.

The angle of elevation of the top of a building from thee foot of the tower is 30 degree and the elevation of the top of the tower from the foot of the building is 30 degree and the elevation of the top of the tower from the foot of the building is 4

A college has raised 75% of the amount it needs for a new building by receiving an average donation of $60 from the people already solicited(GMAT-MATHS)

Consider the following statements regarding safety during demolition of a multistorey building :

Five Men can paint a building in 20 days, 8 Women can paint the same building in 25 days and 10 Boys can paint it in 30 days. If a team has 2 Men, 6 Women and 5 Boys, how long will it take to paint the building ?

Architecture and Planning : Two design options of a business building on a 10.0 hectare site are being compared for built up area. Floor to floor height of Option A is 3.6 m and that of Option B is 4.5 m. If the maximum allowable building height is 45 m with same ground coverage for both options, the additional built up area achievable in Option A over Option B is______percent.

Which of the following is a body-building food? i. fruits ii. Oils iii. Pulses iv. Cereals- NCERT Science-Cbse- Class 6th- 2016

Does any one has tall building notes?

The water consumption of a high rise apartment building with 60 dwelling units having an average household size of 5 persons is 135 lpcd. Assuming 80% of the total use is met with recycled water supply, the daily domestic demand for the building is _________ litres. (GATE-Architecture-Planning-2018)

The plan view at just below window-sill level, but not showing door openings- is shown - of an outpost building of, say, the Forest Department. Section AA extending just a little above ground level GL and fully below ground level is shown. The wall and first footing are of random-rubble masonry in cement mortar; and the lowest part of the foundation is of mass rubble in cement mortar. The total volume of the 40 cm deep footing for the whole building is, nearly

Which of the following is NOT a Building Information Modeling software tool (GATE-Architecture-Planning-2018)

'Most of the residents' 'were inside the building' 'when it was collapsed.'

During the construction of tall buildings, the equipment used for hoisting building materials to the upper floors is a (GATE-Architecture-Planning-2018)

Regard to Babel, what are the benefits of jsx while building react components?

You may like
Building command line applications