Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase

001
Test Implementation and execution has which of the following major tasks?

001
A Test Plan Outline contains which of the following :-

000
One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Indentify the invalid Equivalance class

000
In a Examination a candidate has to score minimum of 24 marks inorder to clear the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance values if the student clears the exam.

000
Which of the following statements regarding static testing is false:

001
Verification involves which of the following :-

000
Component Testing is also called as :-

001
Link Testing is also called as :

001
What is the expected result for each of the following test cases?

000
Methodologies adopted while performing Maintenance Testing:-

001
Which of the following is true about Formal Review or Inspection:-

000
The Phases of formal review process is mentioned below arrange them in the correct order.

000
Consider the following state transition diagram of a two-speed hair dryer, which is operated by pressing its one button. The first press of the button turns it on to Speed 1, second press to Speed 2 and the third press turns it off. Which of the following series of state transitions below will provide 0-switch coverage?

000
White Box Techniques are also called as :-

001
What is an equivalence partition (also known as an equivalence class)?

001
The Test Cases Derived from use cases

000
Exhaustive Testing is

000
Which of the following is not a part of the Test Implementation and Execution Phase

001
Which of the following techniques is NOT a White box technique ?

001
A Project risk includes which of the following :

000
In a risk-based approach the risks identified may be used to :

000
Which of the following is the task of a Tester?

000
The Planning phase of a formal review includes the following :-

000
A Person who documents all the issues, problems and open points that were identified during a formal review.

000
Who are the persons involved in a Formal Review :-

000
Which of the following is a Key Characteristics of Walk Through

000
What can static analysis NOT find?

001
Incidents would not be raised against:

000
A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious outsiders.

001
Which of the following is not a major task of Exit criteria?

001
Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.

001
Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :-

001
Static analysis is best described as:

001
One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class

000
Reviewing the test Basis is a part of which phase

001
Reporting Discrepancies as incidents is a part of which phase :-

001
Which of the following items would not come under Configuration Management?

001
Handover of Testware is a part of which Phase

000
The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. When the temperature is more than 21. Identify the Equivalance values which belong to the same class.

000