1)COTS is known as

103
2) From the below given choices, which one is the ‘Confidence testing’

001
3)‘Defect Density’ calculated in terms of

001
4)‘Be bugging’ is known as

001
5)An expert based test estimation is also known as

001
6)When testing a grade calculation system, a tester determines that all scores from 90 to 100 will yield a grade of A, but scores below 90 will not. This analysis is known as:

001
7)All of the following might be done during unit testing excep t

001
8)What is the concept of introducing a small change to the program and having the effects of that change show up in some test?

002
9)Which of the following characteristics is primarily associated with software re- usability?

001
10)Which of the following software change management activities is most vital to assessing the impact of proposed software modifications?

002
11)Which of the following statements is true about a software verification and va lidation program?

101
12)Which of the following is a requirement of an effective software environme nt?

001
13)A test manager wants to use the resources available for the automated testing of a web application. The best choice is

001
14)A project manager has been transferred to a major software development pr oject that is in the implementation phase. The highest priority for this project manager should be to

001
15)Change X requires a higher level of authority than Change Y in which of the following pairs?

001
16)Which of the following functions is typically supported by a software quality information system?

001
17) During the te sting of a module tester ‘X’ finds a bug and assigned it to developer. But developer rejects the same, saying that it’s not a bug. What ‘X’ should do?

001
18)The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to

001
19) A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages.

001
20)In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and system integration testing after system testing.

001
21)Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing.

001
22)There is one application, which runs on a single terminal. There is another application that works on multiple terminals. What are the test techniques you will use on the second application that you would not do on the first application?

001
23)You are the test manager and you are about the start the system testing. The developer team says that due to change in requirements they will be able to deliver the system to you for testing 5 working days after the due date. You can not change the resources(work hours, test tools, etc.) What steps you will take to be able to finish the testing in time.

001
24)Item transmittal report is also known as

001
25)Testing of software used to convert data from existing systems for use in replacement systems

001
26)Big bang approach is related to

001
27)Cause effect graphing is related to the standard

001
28)“The tracing of requirements for a test level through the layers of a test d ocumentation” done by

001
29)A test harness is a

001
30)You are a tester for testing a large system. The system data model is very large with many attributes and there are a lot of inter dependencies with in the fields. What steps would you use to test the system and also what are the efforts of the test you have taken on the test plan

001
31)Change request should be submitted through development or program management. A change request must be written and should include the following criteria.

001
32)‘Entry criteria’ should address questio ns such as

001
33)“This life cycle model is basically driven by schedule and budget risks” This statement is best suited for

001
34) The bug tracking system will need to capture these phases for each bug.

001
35)One of the more daunting challenges of managing a test project is that so many dependencies converge at test execution. One missing configuration file or hard ware device can render all your test results meaning less. You can end up with an entire platoon of testers sitting around for days. Who is responsible for this incident?

001
36)System test can begin when?

001
37)Test charters are used in ________ testing